CUSTOMER STORY · POLYMER COMPOUNDING

Polymer compounder reduces downtime by 39%

In June 2024, the plant integrated ioTORQ LEAN across its Ontario polymer plant, unlocking real-time production analytics while logging every line stop, duration and causation. The data identified two major equipment failures, skip hoist and mixer seals, as major sources of lost hours.

The plant used ioTORQ LEAN to both justify replacing the equipment and monitor subsequent productivity improvements.

39%
Downtime reduction
4%
Additional run hours available
9.3 hours
Downtime improvement per 100 run hours

Scope: 3 x lines, Oct25 to Sep26 vs Oct24 to Sep25 baseline, excluding planned weekend shutdowns.

Leveraging Data to Unlock Savings

1 Find the losses MEASURE

Every stop gets a reason in ioTORQ LEAN. The Losses Report Pareto Analysis put the skip hoist (8% of downtime) and mixer seals (10%) on top.

2 Justify the spend PLAN

A year of lost hours per failure backed the capital request: A new mixer on Line 3 and three identical skip hoists were justified and purchased, with the new mixer alone expected to save 120 hours a year.

3 Fix it DO

New mixer and hoists in service by October 2025. The three hoists share every part, so one set of spares covers all lines.

4 Prove it worked CHECK · ACT

Since late September 2025, neither failure stopped a line for over an hour, with long stops going from 24 to zero.

RESULTS

More production capacity, less downtime

FACILITY 3 polymer
compounding lines
LOCATION Ontario, Canada
SOLUTION ioTORQ LEAN
LIVE SINCE June 2024
Year on year, all three lines
Measure Change
Additional run hours available 4%
Downtime reduction 39%
Downtime improvement per 100 run hours 18.5 → 9.2 h
Skip hoist & seal stops over 1 h 24 → 0
Skip hoist & seal downtime 252 → 0.2 h (−99.9%)
Downtime per 100 running hours, by line
2024–25 2025–26
17.0
10.1
19.7
10.1
18.8
7.0
Line 1−41%
Line 2−49%
Line 3−63%

Unlocking the benefits

The new mixer and skip hoists removed 252 hours of downtime a year, about 45% of the total reduction.

Better data, firmer decisions

Stops with no reason fell from 411 to 38. Downtime with a known cause rose from 65% to 95%, so the next decisions start on firmer ground.

The downtime tracker showed us which equipment was costing us the most. That gave us a structured case to replace it.

Plant Manager, Polymer Compounder [Confidential]

The next opportunity

Extruder screen changes now top the list at 93 h. The plant runs the same cycle on it: Measure, Plan, Do, Check, Act.